The steps for operating a relay protection tester can be divided into the following stages: ✅ Preparation: ⇨Make sure the tester is connected to a 220V AC power supply and is reliably grounded. ⇨Start the tester, select "I accept" and confirm, and wait for the system to. The JBC, JBCG and JBCV relays consist of three units, an instanta-neous power-directional unit (bottom) of the induction-cup type, a time overcurrent unit (middle) of the induction-disk type, and an instantaneous-over-current unit (top) of the induction-cup type. The instrument uses single-chip microprocessor technology over the same period by the number of milliseconds the table automatically, logic control unit, multi-function digital display. The yellow, green, red and black terminals on the panel of the relay protection tester are the voltage output terminals of the instrument. There is a DC output and power connection on the back of the panel.
[PDF Version]